Rules, surface, quantities
Check what the council allows, pick a surface and see the stone and the skips the job needs. Then you know what to ask for.
Do I need permission?
Answer for your house. You get what to ask the council.

Which surface suits me?
Set how much each thing matters, from 0 to 5.
Left is not important, right is very important.
How much stone and how many skips?
Enter the size and the surface. You get the dig out, the sub-base and the skips.

A driveway is built from the ground up
Most failures come from the layers below the top. Cardiff grew from a small town into a coal port in the 19th century and now has about 362,000 people, with many streets of older houses and small front gardens, where a driveway has to fit a tight space and the rules matter.
- SurfaceBlocks, resin bound stone, tarmac or gravel, 20 to 60 mm.
- Laying courseAbout 40 mm of sharp sand or fine stone for a flat bed.
- Sub-base100 to 150 mm of compacted type 1 stone, the part that carries the weight.
- FormationThe dug and compacted ground, with a membrane where the soil is soft.
Five surfaces in plain words
| Block paving | Concrete or clay blocks laid on sand. Strong and repairable, and a permeable version lets water through. Weeds in the joints need sweeping and re-sanding. |
|---|---|
| Resin bound | Stone mixed with resin and trowelled in one smooth layer. It is permeable and has no loose stone, and it costs more and needs a very good base. |
| Tarmac | Hot asphalt rolled flat. A lower cost and a quick job, but it is not permeable unless it is a porous mix, and it can soften in heat. |
| Gravel | Loose stone over a membrane, with a grid to hold it. The lowest cost and fully permeable, but it needs topping up and raking, and it is hard for wheelchairs and bikes. |
| Imprinted concrete | Poured concrete stamped with a pattern and colour. A solid surface, but it is not permeable, and repairs to a stained or cracked patch can show. |
21 places around Cardiff
Grouped by council, which is who to ask about dropped kerbs and planning. Distances are in miles, in a straight line from the city centre.
Cardiff Council
- Llandaff CF52.0 mi
- Cyncoed CF232.6 mi
- Whitchurch CF142.8 mi
- Rumney CF32.8 mi
- Rhiwbina CF143.1 mi
- Llanishen CF143.3 mi
- Radyr CF153.9 mi
- Lisvane CF144.1 mi
- Pontprennau CF234.1 mi
- St Mellons CF34.5 mi
- Pentyrch CF156.0 mi
- Creigiau CF156.9 mi
Vale of Glamorgan Council
- Penarth CF643.3 mi
- Dinas Powys CF643.9 mi
- Barry CF636.4 mi
- Cowbridge CF7111.6 mi
Rhondda Cynon Taf Council
- Taff's Well CF155.1 mi
- Pontypridd CF3710.9 mi
Caerphilly County Borough Council
- Caerphilly CF836.8 mi
Newport City Council
- Newport NP1910.8 mi
What a driveway quote should include
- The area and the surfaceThe size in square metres, the material, the colour and the pattern, with a sketch or a measured drawing.
- The build upDepth of the sub-base and laying course, edge restraints, and whether a membrane goes under.
- DrainageWhere the water goes: a permeable surface, a soakaway, a drain or a channel to a border.
- PermissionWhether planning permission or a dropped kerb is needed and who applies for it and pays.
- The price and the daysA total with the dig out and the waste in it, when payments are due and how many days the job takes.
- The guaranteeHow long the surface is guaranteed, and what is covered if it sinks or the blocks move.
Driveways in Cardiff: common questions
Do I need planning permission for a new driveway in Cardiff?
Often not. Many front garden driveways are allowed without it if the surface is permeable, or if the water drains to a lawn or a border, when the hard surface is more than 5 square metres. A new access onto a classified road needs permission, and so do some listed buildings and flats. Check with Cardiff Council, or the council for your area.
Do I need a dropped kerb?
If the driveway crosses the pavement or a verge, yes. The council's permission is needed, and the work is done to its standard, often by an approved contractor. The checker on this page gives a pointer.
How much does a driveway cost?
It depends on the area, the surface and the dig out. Block paving and resin cost more per square metre than gravel or tarmac. The quantities tool on this page gives the stone and the skips, and a written quote gives the price.
Which surface lasts longest?
A well laid block paving or resin driveway can last for decades, and a poor base ruins any surface. The preparation matters more than the top layer. The surface chooser on this page weighs five priorities.
Can I use my driveway to charge an electric car?
Often yes, but it is a job for an electrician. Ask your driveway contractor to leave a duct under the surface for a cable if you plan to fit a charger.
How long does it take?
A normal driveway takes a few days from dig out to finish, with a day or two more for the dropped kerb, and the weather matters. Resin needs dry weather and a day to set.
Will the water run onto the road or the house?
It should not. A good driveway falls away from the house and sends water to a permeable surface, a soakaway or a border. Ask where the water goes.
Which areas near Cardiff do you cover?
21 places around Cardiff are listed on this page, from Penarth, Llandaff and Whitchurch to Caerphilly, Barry and Radyr. Put your postcode in the form to check.
Contact us
A question before you ask for a quote? Write to us and we will reply by email.
A new driveway in Cardiff?
Describe the job and get a free quote, with no obligation.
Get my free quote